Hausland strategically positions its finest of the MetroClark series at Barangay Camatchiles, Mabalacat, Pampanga. A perfect residential area for those who loves the countryside living yet be minutes away from the busyness of the city. MetroClark Executive Villas is near the leading commercial establishments and institutions like MAKRO, San Rafael Church, St Rafael Medical Center, Mary Help of Christian School, St. Mutien Marie College, Dau Bus Terminal, North Luzon Expressway (NLEX) and the upcoming Subic-Clark-Tarlac-Expressway (SCTEX). Its transportation is accessible 24 hours anywhere from Angeles City to Capas, Tarlac.
Mainly catering to young professionals, entrepreneurs, private and government employees and OFW’s, Hausland introduces yet another quality project for aspiring future homeowners – the MetroClark Executive Villas.
ANDREA MODEL IMPROVED
Single-Attached Complete Dwelling Unit
Lot Area: 72 sq.m. / Floor Area: 56 sq.m.
Bedrooms: 3 / T & B: 1 / No. of Storey: 1 1/2
• Foundations : Class “A” footing tie beam
• Exterior walls : 4”CHB load bearing
• Interior walls : Metal studs with double wall Fiber cement board
• Windows : Sliding glass windows
• Doors : Panel door at main and service entry, flush door at bedrooms
• Carport : 12”x12” floor tiles with #15 Yellow Mindanao Washout Pebbles boarder floor finished with 2’’x8’’ concrete Trellis
• Exterior ceiling : Metal ceiling joists C-Furring with Fiber cement board
• Interior ceiling : Metal ceiling joists C-Furring with gypsum board
• Roofing : C-Pac Monier Roof tiles
• Ground Floor finishes : 24”x24” tiles floor finished on 4’’ concrete slab
• Stair : Steel stair case covered with solid wooden steps
• Second Floor finishes : 4’’thk. concrete slab on steel decking sheathing material with laminated flooring
• Kitchen : 12”x12” tiles with solid hanging and lower cabinet cover
• Wall finishes : Plastered finished coated with premium paint
• Closet : ¾’’ thk. Plyboard panelling with solid cover
• Toilet & Bath : Complete set of flush type water closet, shower and lavatory, and 12”x12” unglazed floor tiles with 8”x12” glazed wall tiles
• Electrical System : ½” flexible conduit terminating on a circuit breakers
• Plumbing System : Individual conventional septic tank
NOTE: SPECIFICATION OF MATERIALS IS SUBJECT TO CHANGE WITHOUT PRIOR NOTICE DUE TO AVAILABILITY OF SUPPLY IN THE MARKET.
ANDREA BASIC
• Exterior walls : 4”CHB load bearing
• Interior walls : metal studs with double wall Fiber cement board
• Windows : Sliding glass windows
• Doors : Panel door at main and service entry
• Exterior ceiling : metal ceiling joists C-Furring with Fiber cement board
• Interior ceiling : metal ceiling joists C-Furring with gypsum board
• Roofing : C-Pac Monier Roof tiles
• Ground Floor finishes : Plain cement finished, 4’’ thk. concrete slab
• Stair : Steel stair case with solid wooden steps
• Second Floor finishes : 4’’thk. concrete slab, plain cement finished on steel decking sheathing material
• Kitchen : 12”x12” tiles counter top
• Wall finishes : Plastered finished coated with premium paint
• Toilet & Bath : Complete set of flush type water closet, shower and lavatory and 8”x8” unglazed floor tiles with 8”x12” glazed wall tiles
• Electrical System : ½” flexible conduit terminating on a circuit breakers
• Plumbing System : Individual conventional septic tank
ALTHEA BASIC
FEATURES & SPECIFICATIONS
• Foundations : Class “A” Reinforced Concrete Footing Tie Beams
• Exterior walls : 4”CHB Load bearing
• Interior walls : Metal studs with double wall partition gypsum board
• Windows : Sliding glass windows
• Doors : Panel door at main and service entry, moulded door at bedrooms
• Carport : Plain cement finished
• Exterior ceiling : Metal ceiling joists C-Furring with hardiflex board
• Interior ceiling : Metal ceiling joists C-Furring with gypsum board
• Roofing : C-Pac Monier Roof tiles
• Ground Floor finishes : Plain cement finished
• Stair : Steel stair case with solid wooden steps
• Second Floor finishes : Plain cement finished
• Kitchen : 12’’x12’’ tiles counter top
• Wall finishes : Plastered finished coated with premium paint
• Toilet & Bath : Complete set of water closet, shower and lavatory and 12”x12” unglazed floor tiles with 8”x12” glazed wall tiles
• Electrical System : Strategically installed lighting and power system insulated with flexible conduit
• Plumbing System : Individual conventional septic tank
ALTHEA IMPROVED
• Exterior walls : 4”CHB load bearing
• Interior walls : Metal studs with double wall partition gypsum board
• Windows : Sliding glass windows with security grilles and screen
• Doors : Panel door at main and service entry, moulded door at bedrooms
• Carport : 12”x12” floor tiles with Pebbles boarder floor finished
• Exterior ceiling : Metal ceiling joists C-Furring with hardiflex board
• Interior ceiling : Metal ceiling joists C-Furring with gypsum board
• Roofing : C-Pac Monier Roof tiles
• Ground Floor finishes : 24’’x24” floor tiles finished
• Stair : Steel Stair case with solid wooden steps
• Second Floor finishes : Laminated flooring
• Terrace : 12”x12” floor tiles with Pebbles boarder floor finished
• Kitchen : 12’’X12’’ tiles counter top with solid hanging and lower cabinet cover
• Closet : Plyboard panelling sliding mirror glass cover
• Wall finishes : Plastered finished coated with premium paint
• Toilet & Bath : Complete set of water closet, shower and lavatory and 12”x12” unglazed floor tiles with 8”x12” glazed wall tiles
• Electrical System : Strategically installed lighting and power system insulated with flexible conduit
• Plumbing System : Individual conventional septic tank
SUBDIVISION FEATURES & AMENITIES
• Elegant Entrance Gate with 24-hrs. Security Check
• Function Hall and Landscaped Garden for Relaxation
• Parks and Children’s Playground
• Parking Area
• Basketball Court
• Concrete Roads, Curbs and Gutters
• Concrete Sidewalk
• Underground Concrete Drainage System
• Underground Waterline Piping System
• Pre-cast Electrical Post
• Provision for Cable Wire System
• Provision for Telephone Wire System
• Commercial Stalls
• Concrete Perimeter Fence within the Subdivision Premises









Hi po, pwede po ba mamwisit lng dito…. feel ko lng hehehehe!!! Hi Ate Mae…
mgkano approximately yung althea improved at yung premier model improved?
awaiting for your reply.
hi! paano ba computation nung althea improved? kasi ung sa prize contract eh 2.2M un lang ba hindi ba ung nasa gaya nung 18thou./mons multiply by example is 30years= 60M? ganun ba? pls. reply! we are very interested about it i already had a trpping in the site.
hi, i visited your site, hinahanap ko ung pricelist prang wala nman poh ata dun. please send me a copy of your prices. nsa uae poh kc ko nw.thanks…